Secondary Steel for Aura Project
T Sullivan Engineering was responsible for installing balustrades across multiple stair cores within the
Aura Project. These balustrades not only provided safety and support but were also designed to
enhance the aesthetic appeal of the stairwells. Precision engineering ensured that each installation
met the strict safety and design standards required by the project.
The Project
The project demanded the installation of various secondary steelwork, which was crucial for the project. T Sullivan Engineering’s team worked ensuring seamless compatibility with the primary structure.
One of the standout features of the Aura Project is its rooftop terrace, offering residents and visitors panoramic views of the Liverpool skyline. T Sullivan Engineering completed the installation of balustrades around the terrace, ensuring both safety and style. The balustrades were designed to withstand the elements while maintaining a sleek, modern look that complements the overall design of the building.
The external metalwork package for the Aura Project included the installation of balustrades to access ramps and steps. This work was critical for ensuring safe and accessible entry points to the building. T Sullivan Engineering provided robust and durable metalwork solutions that were both functional and visually appealing, contributing to the project’s commitment to accessibility and design excellence.
T Sullivan Engineering successfully completed all aspects of their involvement in the Aura Project, delivering high-quality metalwork that met the project’s demanding specifications. The finished
product stands as a testament to the company’s commitment to excellence in engineering and construction. The balustrades and steelwork not only contribute to the safety and functionality of
the building but also enhance its overall aesthetic, helping to position the Aura Project as a premier development in Liverpool.
The project stakeholders expressed high satisfaction with the work completed by T Sullivan Engineering. Their ability to deliver on time and within budget, without compromising on quality,
was particularly appreciated. The attention to detail and the seamless integration of the metalwork with the building’s design were highlighted as key factors in the project’s success.